Trace.HV
Root Cause Engine · v4.2
Priority · Critical · Active InvestigationLINE 2 · LIVE

IP67 Sealant Failure on High-Voltage Battery Enclosure during Line 2 Assembly.

Defect ID · HV-2419Assembly · Pack Module B · Station S-14Detected · EOL Leak TestOwner · QE.Rodriguez
Units Impacted
47
Containment
100%
RCA Progress
80%
Module 01

Dynamic 5-Why Analysis

Sequential interrogation from symptom to systemic cause.

  1. 1
    Why 1
  2. 2
    Why 2
  3. 3
    Why 3
  4. 4
    Why 4
  5. 5
    Why 5 · Root Cause
    Root
Module 02

Live Telemetry

Line 2 · Pack Module B · Station S-14

Bead Thickness
Spec ≥ 3.0 · Machine
1.44mm
Out of Spec
Sealant Viscosity
Spec 5–7k · Material
8390cP
Out of Spec
Ambient Temp
Spec 18–24 · Mother Nature
31.4°C
Out of Spec
Nozzle Pressure
Spec 5–7 · Machine
6.21bar
In Spec
Cycle Time
Spec ≤ 45 · Method
42.1s
In Spec
Streaming · 1.5s tick